Algoma Boulevard Project

PROJECT DESCRIPTION

The work remaining under this contract consists of the public construction of concrete pavement and sidewalk on Algoma Boulevard, along with electrical work.

Construction work for City Contract 22-04 is anticipated to be complete by November 18. The general contractor is Dorner, Inc. out of Luxemburg, Wisconsin. Please be advised that the schedule below is tentative and subject to change due to weather conditions, scheduling changes, and private utility conflicts. City garbage/recycling will remain on your normal day. Please have your carts to the curb by 7:00 am. New street lights have been installed along Algoma Boulevard between Wisconsin Street and Congress Avenue. Please contact Dan Kussman, City Electrician at (920) 232-5350 for specific information.

Do you have a comment, question or concern? Please find our form at the bottom of that page.
If there is an Emergency, please contact UWO Police or call 911.

It is anticipated that Algoma Boulevard will re-open fully to traffic between Wisconsin Street and Congress Avenue the morning of November 18. High Avenue traffic will return to one-way traffic in conjunction with Algoma Boulevard re-opening. Please anticipate this upcoming traffic pattern change and exercise caution when traveling along Algoma Boulevard and High Avenue.

Notice for property owners: Algoma Boulevard between Congress Avenue and Woodland Avenue is open to local traffic with access off of New York Avenue. Sidewalk and driveway paving has been complete and all driveways are now open. Grass seed has been planted, but property owners are responsible for watering and providing proper care. However, there will be a spring tune up performed by the contractor for areas where the grass seed did not properly grow and/or topsoil has settled in late May or early June of 2023. It is also anticipated that all replacement terrace trees will be planted the week of November 14, for property owners who requested replacement trees. Please note that tree locations were determined by the City Landscaping Operations Manager in order to avoid conflicts with underground utilities.

CONSTRUCTION ACTIVITY

City Construction Activity

Algoma Boulevard (Congress Avenue to Wisconsin Street)

Al Dix Concrete Inc. is anticipated to pave sidewalk at the southeasterly corner of the Algoma Boulevard and Congress Avenue intersection.

Fox River Landscaping is anticipated to install all replacement terrace trees.

TNT Professional Land Surveyors is anticipated to re-install all property monuments that were disturbed or removed during construction along Algoma Boulevard.

TRAFFIC RESTRICTIONS

High Avenue (W New York Avenue to Osceola Street)

This section of High Avenue is temporarily accommodating two way traffic while Algoma Boulevard is closed for construction. See the attached “Traffic Control Plans – Algoma Boulevard Closure (Congress to Wisconsin)” for specific details on traffic pattern changes.

It is anticipated that Algoma Boulevard will re-open fully to traffic between Wisconsin Street and Congress Avenue either the evening of November 11 or the morning of November 18. High Avenue traffic will return to one-way traffic in conjunction with Algoma Boulevard re-opening.

Algoma Boulevard (Congress Avenue to Wisconsin  Street)

This section of Algoma Boulevard is closed for construction. While this section of Algoma Boulevard is closed, traffic has been detoured to High Avenue which will temporarily accommodate two way traffic.  Please see the attached “Traffic Control Plans – Algoma Boulevard Closure (Congress to Wisconsin)” for specific details on traffic pattern changes.

It is anticipated that Algoma Boulevard will re-open fully to traffic between Wisconsin Street and Congress Avenue either the evening of November 11 or the morning of November 18. High Avenue traffic will return to one-way traffic in conjunction with Algoma Boulevard re-opening.

GO Transit’s current bus route detour statement:
The No. 5 & 10 Bus Routes that travel along Algoma Boulevard and High Avenue have been detoured for the closure of Algoma Boulevard between Congress Avenue and Osceola Street.  Please contact GO Transit at (920) 232-5340 or visit the GO Transit website for specific information about bus route detours.

Project Timeline

Vacated Blackhawk (Pedestrian mall from Reeve to Student Rec)

Note: Pedestrian mall is complete and open for use from High Avenue to Fox River
Electrical – Complete
Irrigation Line Repairs – Complete
Sidewalk – Complete
Landscaping – Complete

Algoma Boulevard (Wisconsin to Woodland)
Road Closed from April  to October 1
Utilities – Complete
Road Excavation – Complete
Underground Electrical – Complete
Concrete Road Pavement – Complete
Electrical – Traffic Signal, Bases, Wiring and Poles – Complete
Sidewalks – Complete
Landscape – Complete
Asphalt Patching – Complete
Pavement Markings – Complete

Algoma Boulevard (Woodland to Congress)
Road Closed from June 19 through November 11
Utilities – Complete
Road Excavation – Complete
Underground Electrical – Complete
Concrete Road Pavement – Complete
Electrical – Bases, Wire and Poles – Complete
Sidewalks – October 6 to November 16
Landscape – Complete
Asphalt Patching – Complete
Pavement Markings – Complete
Traffic Signals – November 14 – 16
 

Questions, Comments, or Concerns

Do you have a comment or concern about this project? Please let us know using the form below. The form will be submitted to the UWO Police and they will respond as soon as they are able. If this is an emergency, please call the UWO Oshkosh police at (920) 424-1212

Algoma Project Questions and Concerns

Name

We are located in the Campus Services Center across the Fox River from the Oshkosh campus. The facility is the second building on the right hand side of Witzel Avenue.

Monday-Friday
7 a.m. - 4:30 p.m.

650 Witzel Ave.
Oshkosh, WI 54902

Phone: (920) 424-3466

Fax: (920) 424-0259